# The three ways to run a build

Walk the three build-run modes side-by-side — Pick only, Pick and complete, and Pick, complete and send to QC — with worked examples and a decision table.

import Term from '~/components/Term.astro';
import { Aside, Steps } from '@astrojs/starlight/components';
import DocUpdated from '~/components/DocUpdated.astro';

An Assemblified work order can be built in three ways, and you choose which one every time you start a build run. They share the same setup and the same lifecycle, and differ only in **when picking happens, when completion happens, and whether a quality review sits in the middle**.

The three are the options the **Start build run** dialog offers under *What should this run do?*:

- **Pick only** — gather the materials now, finish the build later.
- **Pick and complete** — pick and consume in one go, and produce the finished units immediately.
- **Pick, complete and send to QC** — pick and consume now, but hold the finished units back until a quality review approves them.

This guide walks all three with the same example so you can compare them directly.

## The shared setup

We will use a single example throughout: a work order to build **20 finished units** of a "Premium Backpack" product, where the bill of materials calls for 5 materials and one pre-assembled <Term def="sub-assembly">subassembly</Term>.

<Steps>

1. **Create the work order.** Open **Manufacturing** in the app navigation, which lands on **Work orders**, and click **Create work order** in the title bar. In the dialog, use **Add items** to pick the finished goods (or assembly BOMs) to build and set a quantity for each, choose the **Production location**, then answer **After creating**: *Leave as a draft*, *Mark it ready*, or *Start it right away*. See [creating a work order](/features/work-orders/creating/).

   Two other creation paths live in the title bar's **More actions**: **Create from orders** (plan against real Shopify order lines) and **Create from flow** (see the note below).

2. **Confirm the plan.** Open the new work order and switch to the **Materials** tab. It lists every component the <Term def="spread">spread</Term> generated. Adjust <Term def="effective-quantity">effective quantities</Term> if needed, and set per-row consume-from locations where they differ from the default.

3. **Get it out of Draft.** A draft cannot be built. The page's primary action reads **Mark ready**; click it and the primary becomes **Start build run**. Starting the first run moves the work order to **In progress** by itself, so there is no separate "start" step to remember.

</Steps>

From here, the three modes diverge.

<Aside type="note">
Assembly flows no longer run builds. What survives is **Create from flow**, which uses them as a shopping list for a new work order — as the dialog puts it, *"An assembly flow describes what to build. The work order is what builds it."* If you have flows, they are still a quick way to start one. If you do not, start from **Create work order** and add the items yourself.
</Aside>

## Mode A — Pick and complete (no quality review)

**Use when:** the build is simple, you trust the operator, and you do not need a separate review step. The fastest path through the system.

<Steps>

1. **Open the Build runs & QC tab** and click **Start build run** on the **Build runs** card.
2. **Pick the items and quantities** for this run. For our example, all 20 units of the Premium Backpack.
3. **Choose *Pick and complete*** under *What should this run do?*, confirm the production location, and submit.
4. **What happens.** Assemblified picks every required material in one go, decrements the local and Shopify inventory, consumes the materials immediately, and produces 20 finished units into <Term def="pre-assembled">pre-assembled stock</Term>. The build run goes from **Picking** straight to **Built**.
5. **Complete the work order.** With everything built and nothing waiting for a review, the page's primary action reads **Complete work order**. Click it. The work order is now **Completed**.

</Steps>

**What happened:**

- One <Term def="build-run">build run</Term> exists, status **Built**.
- Inventory: 5 materials decremented (locally and in Shopify), 1 assembly BOM drawn from pre-assembled stock, 20 finished backpacks added to pre-assembled stock.
- No quality review.

**Reverse path:** if something went wrong, the run's **⋯** menu on the Build runs card offers **Reverse run**. It walks the inventory back and drops the produced output.

## Mode B — Pick only, complete later

**Use when:** you want to pick materials on day 1 and physically build over days 2 to 5. This is the common choice for multi-day projects where committed materials need to survive between sessions.

<Steps>

1. **Start build run** and choose **Pick only**. Pick the items and quantities — say, all 20 backpacks.
2. **Submit.** Assemblified picks every required material. The run sits at **Picking**. The materials are committed and decremented from Shopify, but they have not been consumed yet.
3. **Walk away.** The materials are physically gathered at your bench and nobody else can pick them, because they are committed. The work order stays **In progress**.
4. **Days later, complete the run.** The run's row carries a **Complete** button (the same action is in its **⋯** menu as **Complete run**). Assemblified moves the materials from committed to consumed and produces 20 finished backpacks into pre-assembled stock.
5. **Optionally record a quality review.** Once the run is **Built**, its row offers **Add QC**. Use it if you want a sign-off; skip it entirely if you do not.
6. **Complete the work order.**

</Steps>

**What happened:**

- One build run, in two sessions. The pick happened on day 1; the completion on day N.
- Committed materials persist across sessions. Cancel the run mid-way and they go back to available stock.
- A quality review is optional on this mode — nothing forces one.

**Cancel path:** if you decide not to build, choose **Cancel run** on the picking run. The committed materials go back to available, no consumption is recorded, and the Shopify decrement is reversed.

## Mode C — Pick, complete and send to QC (output held back)

**Use when:** the build is regulated or high-stakes and stock must not be released before a sign-off. Pharmaceuticals, food production, custom manufacturing — anything where wrong units should not leave the bench.

<Steps>

1. **Start build run** and choose **Pick, complete and send to QC**. Pick the items and quantities.
2. **Submit.** Assemblified picks the materials and consumes them in one shot. The run goes to **Built** — but **the produced output is held back**. Pre-assembled stock does not increase, and the work order moves to **Quality control**.
3. **Record the review.** The run's row carries an **Add QC** button; the same review can be reached from the **Quality control** card on the Build runs & QC tab. The **Quality review** dialog lists each item with its **Built** quantity and asks for **Approved** and **Failed** quantities. If anything failed, it asks for a failure category and one or more defect reasons, and you can note who reviewed it. Click **Record review**.
4. **Approved units produce at that moment** — not at build-run completion. Failed units become entries under **Items pending rework**.
5. **For each rework item, choose** from its **⋯** menu:
   - **Start rework run** — rebuild the failed units without consuming new materials. Pick a mode again; when that run's review approves, the units finally produce.
   - **Scrap** — the unit is a terminal loss and no rework happens. This cannot be undone.
6. **Move the work order to QC approved.** Once every built unit has a disposition and no rework item is open, select the work order on the **Work orders** list and use the bulk bar's **Change status → Move to QC approved**. The detail page's primary action stays **Review quality** while the work order is in **Quality control**, and its **⋯** menu offers **Move back to In progress** rather than a step forward — so the list is where you make this move.
7. **Complete the work order.** Back on the detail page, the primary action now reads **Complete work order**.

</Steps>

**What happened:**

- The run was started in *Pick, complete and send to QC* mode, which is what held the output back.
- Approved units produced at review time; failed units never produced.
- Scrapped units are a terminal loss; rework runs reuse the already-consumed materials and produce on their own approval.
- The lifecycle visibly went **In progress → Quality control → QC approved → Completed**, and every stop is in the Activity tab.

<Aside type="caution">
**A run's mode is fixed once it starts.** There is no way to turn a started run into a different mode. If you picked the wrong one, cancel it (while picking) or reverse it (once built) and start a new run.
</Aside>

## Choosing a mode

| If you... | Choose |
|---|---|
| Trust the build, need no separate review, want speed | **Pick and complete** |
| Need to pick today and build over days | **Pick only** |
| Need a sign-off before stock is released | **Pick, complete and send to QC** |

You do not have to commit to one mode per work order. **Each build run picks its own mode**, so you can run most of a work order as *Pick and complete* and put the last, trickier batch through QC.

## What stays the same

Across all three modes:

- **The lifecycle** is the same: **Draft → Ready → In progress → … → Completed**. Only the trip through **Quality control** differs.
- **Editing items and materials** is the same. The **Materials** tab is editable in any non-terminal status, whichever mode the runs used.
- **Material planning** is the same. The spread, the cost views, the pre-assembled splits and **Reset materials** work identically.
- **Shopify sync** fires at pick time and completion time the same way, and a run that failed to sync offers **Retry Shopify sync** in its **⋯** menu. See [Shopify sync](/features/work-orders/shopify-sync/).
- **PDFs** are the same. The build overview, pick list and shortage report do not care which mode you used.

## Reversing a build

Any run can be reversed. **Reverse run** on a **Built** run rolls the inventory back whatever mode it used. If you need to undo a whole work order, the title bar's **⋯** menu carries **Reverse all builds**.

If a build run failed its Shopify sync along the way, the work order shows a warning banner with the retry — see [Shopify sync](/features/work-orders/shopify-sync/#the-retry-banner).

## Related

- [Build runs](/features/work-orders/build-runs/) — the mode reference.
- [Quality control](/features/work-orders/qc/) — dispositions, rework and scrap in detail.