# Track building cost

Account for human labour in your BOM costs by modeling work-hours as a virtual material, plus the per-work-order labour adder.

import Term from '~/components/Term.astro';
import { Steps, Aside } from '@astrojs/starlight/components';
import DocUpdated from '~/components/DocUpdated.astro';

A BOM's calculated cost rolls up the unit cost × quantity of every component. Physical materials are easy to model. **Human labour** is also a real cost — and Assemblified gives you three ways to track it. This guide walks through them.

<Aside type="tip" title="Start with cost rates">
For per-unit labour, [**Cost rates**](/features/cost-factors/overview/) is now the purpose-built tool: define an hourly rate once, attach it to a BOM with the hours per finished unit, and it appears as its own labour section in the cost breakdown. It also knows the difference between labour and overhead when you push cost to Shopify — a virtual material can't.

Strategy A below still works and is worth understanding, but reach for it only when you specifically want labour to behave like a stocked material.
</Aside>

## On this page

- The three strategies for tracking labour cost
- Strategy A: a virtual "work-hour" material in the BOM (per-unit labour)
- Strategy B: the per-work-order labour cost field (per-batch labour)
- Strategy C: a labour cost rate (per-unit labour, first-class)
- Worked example: a candle with both kinds of labour
- Common gotchas

## The three strategies

| Strategy | When to use | Where it lives | How it scales |
|---|---|---|---|
| **labour cost rate** *(recommended for per-unit labour)* | Per-unit labour, with a rate you maintain in one place across many BOMs. | The **Cost rates** page, attached to a <Term def="bom">BOM</Term> or an <Term def="sub-assembly">assembly BOM</Term>. | Multiplies with order quantity automatically. |
| **Virtual work-hour material in a BOM** | Per-unit labour you want to model as a component — e.g. it should also appear in pick lists or material planning. | Added to the BOM's components like any material. Rolled into BOM total cost. | Multiplies with order quantity automatically. |
| **Per-work-order labour cost** | Per-batch / per-job labour adder — setup time, fixed overhead, one-off labour for a specific run. | The **Labour cost** dialog on the <Term def="work-order">work order</Term>'s Overview tab. Adds to the work order's cost summary. | Lump sum; doesn't scale with quantity. |

You can combine them. They add together. Just don't double-count — be deliberate about whether labour is "per unit produced" (Strategy A or C) or "per build job" (Strategy B), and don't model the same hour twice.

## Strategy A — virtual work-hour material in a BOM

The idea: create a <Term def="virtual-material">virtual material</Term> whose unit cost is your hourly labour rate. Reference it in the BOM with `quantity = hours per unit`. Assemblified rolls it into the BOM total cost using the same `quantity × unit cost × (1 + waste%)` formula as physical materials.

### Step 1: Create the work-hour virtual material

<Steps>

1. Open **Materials** in the app navigation.
2. Click **Create virtual material** in the title bar.
3. Fill in the form:
   - **Product name / Variant name** — descriptive, e.g. *"Operator hours"* / *"Hours"*. You can also create per-role materials like *"Skilled operator hours"* and *"Assembly tech hours"* with different rates.
   - **Unit** — `pcs` works fine; treat each "piece" as one hour for accounting purposes — the rollup math doesn't care about the label. If you want the unit to read literally as `hours` you can add a custom unit in **Settings → Units** and pick it here. Either choice is fine.
   - **Unit cost** — your hourly rate, e.g. `25.00`. This is what gets multiplied by quantity at execution and cost-rollup time.
   - **Selling price** — required by the form; set it to the same value as unit cost or any nominal value (it isn't used by BOM cost rollup).
   - **SKU**, **vendor**, **specifications**, **image** — optional. A SKU like `LABOUR-OP` makes the entry easy to find in pickers.
4. Save.

</Steps>

The new material is now in the Materials list; the **Virtual** metric above the table filters the list down to virtual materials if you want to find it again quickly. It appears in the same component picker BOMs and assembly BOMs use for any other material.

<Aside type="tip">
If you have multiple labour rates (junior vs senior, day vs overtime), create one virtual material per rate. Then mix them in the BOM by quantity.
</Aside>

### Step 2: Add the work-hour material to a BOM

<Steps>

1. Open a BOM detail page and switch to the **Materials** tab.
2. In the **Materials** card, open **Add materials → Virtual materials** and pick your work-hour material. (If you have not created it yet, the same menu's **New virtual material** makes one without leaving the page.)
3. Set **quantity** to the hours one finished unit takes — decimals are fine, e.g. `0.25` for fifteen minutes per unit.
4. **Waste %** — leave at 0. Waste only makes sense for physical materials.
5. **Location** — leave blank. Locations don't apply to virtual materials in any meaningful way.
6. Save.

</Steps>

That's it. The line cost shows up alongside physical materials, and the BOM's **Total cost per unit** now includes labour.

### What the math looks like

For each line:

```
line_cost = quantity × unit_cost × (1 + waste% / 100)
```

So `0.25 hours × $25.00 × (1 + 0%) = $6.25` per finished candle.

The BOM's total cost is the sum of all lines (materials plus assembly BOMs, recursively).

## Strategy B — the per-work-order labour cost field

When the labour isn't per-unit (think: batch setup, calibration time, special tooling for one job), use the work-order labour fields instead. They're a lump sum on the work order, not per item produced.

### Where to set it

<Steps>

1. Open a work order's detail page and stay on the **Overview** tab.
2. Find the cost summary's **Labour cost** figure and expand it. It shows **From bills** (what the attached labour cost rates add up to), an **Operator override** row when someone has entered one, and **Actual cost**.
3. Click **Edit labour cost**. The **Labour cost** dialog opens with two number fields:
   - **Current planned cost** — your labour-cost target for this job.
   - **Actual cost** — the labour actually incurred.
4. Enter values, or leave a field empty to say nothing about it. Zero means this work order costs no labour.
5. Save.

</Steps>

### How it shows up

The cost summary reads in three stages — **Original planned cost**, **Current planned cost** and **Actual cost** — and labour has a line in each:

- Labour starts **prefilled from the bills' labour cost rates**. That prefilled figure is what the Original planned cost stage shows.
- What you type into the dialog's **Current planned cost** is the **operator override**, and it is what the Current planned cost stage uses. It never rewrites the prefilled figure, so you can always see both.
- **Actual cost** feeds the Actual cost stage.

This is on top of any virtual-hour materials inside the bill — those still scale with quantity in the work order's spread cost. The labour figure is purely an additional adder.

<span id="strategy-c--an-additional-costs-labour-factor"></span>

## Strategy C — a labour cost rate

The purpose-built path. Create the rate once, attach it wherever the work happens:

<Steps>

1. Open **Settings → Cost rates** and click **New cost rate**.
2. Set **Name** (*"Operator hours"*), **Kind** = **Labour**, **Unit** = `hour`, **Rate** = your hourly rate.
3. Open a BOM (or assembly BOM) detail page, switch to the **Materials** tab, find the **Additional costs** card, pick the cost rate, and enter the hours **one finished unit** takes — `0.25` for fifteen minutes.
4. Click **Add**. Done — no separate save.

</Steps>

What this buys you over Strategy A:

- **One rate, many BOMs.** Change it once; every BOM re-prices immediately.
- **Its own section** in the BOM's Financial breakdown, rather than hiding among materials.
- **No waste %** to accidentally set on labour.
- **Work orders freeze the rate** they were created with, so a rate change never rewrites a job you already priced — and the labour is computed into that work order's cost for you.
- **Labour vs. overhead is a real distinction** when pushing cost to Shopify, so labour can't be charged twice.

See [Cost rates](/features/cost-factors/overview/) for the full picture, and [on work orders](/features/cost-factors/work-orders/) for the labour hand-over.

## Worked example: a candle with both layers

Setup:
- Vanilla Candle BOM contains: 1 jar @ $2, 1 wick @ $0.50, 0.25 hours of operator time @ $25/h.
- BOM total cost = `2 + 0.50 + (0.25 × 25) = $8.75`.

A work order is created for **40 candles**.
- Spread cost from materials = `40 × $8.75 = $350`. That includes `40 × $6.25 = $250` of operator labour from Strategy A.

Plus, this batch needed a one-time tooling setup. The operator enters **Current planned cost = $50** in the work order's **Labour cost** dialog.

- WO Current planned cost total = `$350 (materials including per-unit labour) + $50 (planned WO labour) = $400`.

When the build is done and `Actual labour = $55` is entered, the Actual cost column shows `$355` (assumes actual material spend matched planned) plus `$55 = $410`.

## Reading the cost out

- **For BOMs** — open the BOM detail page and stay on the **Overview** tab: the **Financial breakdown** card rolls everything up, and expanding its **Materials** line shows your work-hour material with its line cost. The rows themselves are edited on the **Materials** tab. See [Check BOM margin and cost breakdown](/guides/check-bom-margin/) for a full walkthrough.
- **For work orders** — the cost summary on the work order's **Overview** tab shows Original planned cost / Current planned cost / Actual cost with labour rolled in.

## Common gotchas

- **Don't double-count.** A BOM-component virtual hour material **and** a planned-labour value on the WO will both flow into the cost. Pick the one that matches your reality.
- **Currency.** The virtual material's unit cost and the WO labour fields are both in your store currency. Assemblified doesn't convert.
- **Scaling.** Strategy A scales with order quantity automatically; Strategy B doesn't. If a customer orders 100 candles instead of 10, your per-unit labour grows 10× — your batch labour stays the same.
- **The unit label is cosmetic.** No math depends on it. `pcs` is fine — or define a custom `hours` unit in **Settings → Units** if you want it to read literally.
- **Waste % on labour materials is meaningless.** Leave it at 0. Setting a waste % multiplies your labour cost just like a real material's, which is almost never what you want.
- **Sync the cost back to Shopify** if your storefront's "cost per item" should reflect labour. See [Sync BOM cost to Shopify](/guides/sync-cost-to-shopify/).

## Where to next

- [Cost rates](/features/cost-factors/overview/) — the first-class way to model per-unit labour and overhead.
- [Sync BOM cost to Shopify](/guides/sync-cost-to-shopify/) — push the labour-inclusive cost to Shopify so its margin reports are accurate.
- [Check BOM margin and cost breakdown](/guides/check-bom-margin/) — read the rolled-up cost on the BOM detail page.
- [Virtual materials](/features/raw-materials/virtual-materials/) — reference for the virtual material concept.