# Quality control & rework

QC reviews, dispositions, rework runs, scrap tracking, and how output timing differs across the three build modes.

import Term from '~/components/Term.astro';
import { Aside } from '@astrojs/starlight/components';
import DocUpdated from '~/components/DocUpdated.astro';

Quality control is the optional sign-off step between building units and releasing them as finished stock. Every QC review records a per-unit <Term def="disposition">disposition</Term> — how many were approved, how many were failed — and Assemblified routes the consequences automatically.

**QC is decided per build run, not per work order.** A run you deliberately built without QC never
waits for a review and never holds the work order up — even on a work order where other runs went
through QC. You can still add a review to any completed run afterwards; it is offered, never
required.

## On this page

- Where QC lives on the page
- Running a QC review
- Adding QC to a run you already built
- Completing a work order without QC
- Failed units: rework or scrap
- Rework runs
- Output timing across the three build modes
- Mixing QC and non-QC runs

## Where QC lives on the page

The **Build runs & QC** tab has two parts. The **Build runs** card on top is every run and what it moved. Underneath it, a **Quality control (QC)** section holds:

- **The reviews table** — one row per review, with **Review · Run · Result · Approved · Failed · Reviewed by · Reviewed**. *Result* is a badge: **Passed**, **Partly passed**, **Failed**, or **Voided** when the run the review covered was later reversed. Its row menu offers **Open review**, which shows the saved review read-only.
- **The rework table** — only present when something is waiting: one row per rework item, with **Item · Quantity · Notes**, and a per-row menu offering **Start rework run** and **Scrap**.

The reviews table's empty state says it plainly: *"Complete a build run, then record a quality review."*

## Running a QC review

Every completed run that nobody has reviewed carries its own button on the Build runs table:
**Review** when the run was built for QC and is waiting for one, **Add QC** when it was not. Either
opens the review for that run — you never have to work out which run a review belongs to. The same
review is offered from an item's row on the Overview tab while exactly one unreviewed run holds that
item's units.

The **Quality review** dialog shows one row per item in the run:

| Column | What it is |
|---|---|
| **Item** | What was built. |
| **Built** | How many units that run produced. |
| **Approved** | The one number you type. It cannot go above what was built, or below zero — either is refused on the cell. |
| **Failed** | Computed for you: built minus approved. |

Because failed is derived, every unit the run built is always accounted for: "I reviewed 3 of the 5"
cannot be recorded by accident.

As soon as anything fails, the dialog asks **"*N* failed. What went wrong?"** and offers two
catalogue fields for the review as a whole:

- **Failure category** — one per review. Pick from the catalogue, or type a new one and press **Add to catalogue**. A typed value that is not in the catalogue is refused: *"That value is not in the catalogue yet. Choose one from the list or add it."*
- **Defect reason** — several per review, added one at a time. Same catalogue rule, same **Add to catalogue** button.

Both catalogues are maintained in **Settings → Work orders → Quality control** — see [work-order settings](/features/work-orders/settings/#quality-control-catalogues).

Under that, **Reviewed by** and free-text **Notes**. Press **Record review** and the review is
written and its side effects fire immediately.

<Aside type="note">
There is no draft state and no second review. **Record review** is the only submit, and once a run
has a review its **Review** / **Add QC** button is gone — one review per run.
</Aside>

## Adding QC to a run you already built

A run built without QC shows **Add QC** on its row for as long as nobody has reviewed it. Press it and
the review works exactly as above: the units are already in finished stock, so approving changes
nothing and failing takes the failed units back out again (see [failed units](#failed-units-rework-or-scrap)).

This is the escape hatch for "we built it, then decided it needed checking" — you do not have to
reverse the run and rebuild it in the other mode.

## Completing a work order without QC

If you never open a review, nothing about QC stands between you and **Complete work order**. Once
every item has reached its planned quantity and no run is still picking, the primary button at the
top of the page becomes **Complete work order** and you press it. **Send to QC** stays available in
the page's **More actions** menu for when you do want the extra stage.

If you have used QC on this work order, the completion checks apply — but only to the runs that were
actually under QC: every unit built by a QC run has to be dispositioned, no items may still be in
rework, and no QC run may be left unreviewed. A run you built without QC alongside them is not part of
that, and does not block completion.

<Aside type="note">
Runs completed before QC became a per-run choice are still treated as waiting for a review. If an old
work order refuses to complete, look for a run on it that was never reviewed — one review clears it.
</Aside>

## Failed units: rework or scrap

A failed disposition creates a **rework item**, which appears as a row in the Quality control section's rework table. From there you have two paths, both on that row's **⋯** menu:

- <Term def="rework">**Start rework run**</Term> — fires a rework build run that targets those failed units. Rework runs don't consume new materials; the materials were already consumed in the original run. Once the rework run completes and its QC review approves, the units land in finished stock.
- <Term def="scrap">**Scrap**</Term> — a terminal loss, and it asks first: *"Scrap this item? … cannot be recovered."* If the original run was one whose output had already been produced, scrapping also reverses one unit of produced output so finished stock stays consistent.

Both paths are operator-driven — Assemblified doesn't auto-rework or auto-scrap. You decide based on whether the failure is fixable.

The counts land in two places you can read: the reviews table's **Approved** and **Failed** columns, and — per item — the **Status** cell on the Overview tab's Items card, whose disclosure breaks out how many units are **in rework** and how many were **scrapped**.

## Rework runs

A rework run is a build run marked **Rework** in the Build runs table's Mode column. Starting one is a single press of **Start rework run** on the rework row: there is no dialog and **no mode to pick**. Every rework run is fired as **Pick, complete and send to QC**, because you are already running QC on those units.

The rework run picks no fresh materials. It only goes through the build → complete → QC cycle to produce the corrected units. If the rework run's QC approves, the units land in finished stock. If it fails again, the cycle can repeat — Assemblified doesn't limit retries.

## Output timing across the three build modes

When does a finished unit actually land in <Term def="pre-assembled">pre-assembled stock</Term>? It depends on the mode the build run was started in.

| Mode | When output lands |
|---|---|
| **Pick only** | When the run is completed. Output lands immediately. QC, if run later, can scrap units, which reverses produced output. |
| **Pick and complete** | At the end of the one-shot action. Same scrap-reverses-produced logic if QC is run later. |
| **Pick, complete and send to QC** | **Deferred.** Output is held until a QC review approves it. Approved units produce at QC-approval time; failed units never produce. The work order is not moved into Quality control automatically — the run itself is what waits. |

The deferred path is what makes the third mode suitable for high-stakes builds — you get a QC sign-off before stock becomes available to other parts of the app.

<Aside type="note">
Deferred output is a property of the run, set when it was started. It can't be changed mid-run. If you
started a run in the wrong mode, cancel or reverse it and start a new one — or just add QC to it
afterwards, which is usually what you wanted.
</Aside>

## Mixing QC and non-QC runs

You can use QC for some runs and not others on the same work order, and the two do not interfere:

- A run built **without** QC is never waiting for anybody and never blocks completion, whatever else
  happened on the work order.
- A run built **for** QC has to be answered for before the work order can complete.
- Either can be reviewed later; only the first was ever *expecting* it.

The mode is fixed when the run starts. If you started one in the wrong mode, cancel or reverse it and
start a new one — or just add QC to it afterwards.

## Related

- [Build runs](/features/work-orders/build-runs/) — the cycle that produces the units QC reviews.
- [Work-order settings](/features/work-orders/settings/#quality-control-catalogues) — the failure categories and defect reasons the review picks from.
- [Work-order flows guide](/guides/work-order-flows/) — the three modes walked through with QC included.
- [Lifecycle](/features/work-orders/lifecycle/) — the QC guards on completion.
- [Glossary](/reference/glossary/).

<DocUpdated date="2026-11-15" />