# Only consume pre-assembled

The "Only consume pre-assembled stock" switch — sales demand stops at that assembly BOM, the buildable-versus-sellable split, and how deficits and cancellations behave.

import Term from '~/components/Term.astro';
import { Aside } from '@astrojs/starlight/components';
import DocUpdated from '~/components/DocUpdated.astro';

In Assemblified, an assembly BOM (defines a <Term def="sub-assembly">subassembly</Term>) normally cascades: once its
<Term def="pre-assembled">pre-assembled</Term> shelf is exhausted, demand falls through into its materials and
nested assemblies. **Only consume pre-assembled stock** turns that off for one bill, so sales demand *stops* at
it.

With the switch on, that bill contributes **only its pre-assembled stock** to anything sales-related. Orders draw
from its shelf and nothing below it is ever consumed; availability is computed from its shelf alone. Deliberate
builds (work orders, Quick build) are unaffected and still pull materials as before.

## On this page

- The switch, and where to find it
- What "stops here" means
- Buildable vs. sellable
- When the shelf runs short (deficits)
- Cancellation and refund behaviour
- Multi-layer trees
- How it differs from the finished-good setting
- Common gotchas

## The switch

Every assembly BOM has its own **Only consume pre-assembled stock** switch, on the assembly BOM page under
**Settings → Preferences**. It is independent of the parent bill and of every other assembly.

- **On.** *Sales stop at this assembly BOM: an order draws only from its pre-assembled stock, and the materials
  below it are left untouched.*
- **Off.** *Sales carry on into this assembly BOM's own materials once its pre-assembled stock runs out.* This
  is the normal behaviour.
- **Default:** off.
- **Plan:** **Enhanced.** On a lower plan the switch is disabled and names the tier it needs.

You can flip it for many bills at once from the Assembly BOMs list: tick rows, then **Assembly settings → Only
consume pre-assembled → Enable / Disable**.

### The same behaviour, at one location only

An assembly BOM can also carry a [location rule](/features/bill-of-materials/location-rules/), which is the
second way to get this cut-off. At a location where the rule's mode is **Disabled** or **Pre-assembled only**,
the assembly behaves exactly as described on this page: sales demand is drawn from its pre-assembled shelf at
that location and never from its components, deficits included. Every other location is untouched.

The switch above is the store-wide choice; a location rule is the per-location one, and a rule can also change the
assembly's own BOM at that location. Location rules need **Multi-location sensitive adjustments** turned on in
**Settings**, and they are part of the Enhanced plan.

## What "stops here" means

With the switch **on**, every sales, order and availability traversal that reaches this assembly treats it as a
leaf: it contributes its pre-assembled quantity and the walk does **not** descend into its components.

Concretely, for a cut-off assembly S that an order needs `N` of:

- `N` is taken from S's pre-assembled shelf.
- S's materials and nested assemblies are **not** touched.
- Availability counts only S's shelf as S's contribution, never the additional quantity its materials could build.

The decision is **per node**. A layer-1 assembly with the switch off still passes its remainder down; if a
layer-2 assembly underneath has it on, the cut happens there instead. Each node decides for itself.

<Aside type="note" title="What is unaffected">
Only **sales and order demand** respect the cut-off. Deliberate physical builds — work orders and building
pre-assembled stock with Quick build — still consume materials normally. The rule of thumb: *fulfilling an order*
honours the setting; *building stock* never does, because building has to consume the materials it is made from.
</Aside>

## Buildable vs. sellable

Once a tree contains a cut-off assembly, "how many can I make?" has two different answers:

- **Buildable** — units you could physically build. Materials inside cut-off assemblies **still count** here.
- **Sellable** — what orders and availability actually use. A cut-off assembly contributes **only** its
  pre-assembled stock; its materials are never counted.

**Example.** An assembly BOM is set to only consume pre-assembled stock and holds 5 pre-built units; its
materials could build 50 more.

- **Buildable = 55** (5 on the shelf + 50 from materials).
- **Sellable = 5** (only the shelf counts).

Where you see the two numbers:

- **On the Assembly BOMs and Finished goods lists**, the buildable column shows the buildable figure only, and
  puts the other in a tooltip that reads "*N* of them sellable". The column answers one question, so it prints
  one number; hover it when a cut-off assembly is somewhere in the tree.
- **On the [structure canvas](/features/structure/)**, a cut-off node is marked with a **Pre-only** chip, and a
  **Sell** value appears beside **Buildable** on the nodes where the two differ.

The detail pages do not show a sellable figure. Use the list column's tooltip or the canvas.

<Aside type="tip">
For a finished good with [dynamic adjustment](/features/bill-of-materials/dynamic-adjustment/) on, the sellable
number is what gets pushed to Shopify, so the storefront never offers buildable units that a cut-off assembly's
materials could theoretically build but that you have chosen not to sell against.
</Aside>

## When the shelf runs short (deficits)

If an order needs more than a cut-off assembly has on its shelf, demand does **not** fall through to materials.
That is the whole point. Instead the full demand is consumed from the pre-assembled shelf, which is allowed to go
**negative**.

A negative shelf is an honest record of a deficit: "this many units were sold against this assembly beyond what
was physically on the shelf." It is not clamped to zero and it is not hidden; the negative balance shows in the
per-location pre-assembled figures on the assembly BOM page.

You resolve a deficit the same way you would top up any shelf: build more, which moves the balance back toward
zero and beyond. Note that Quick build's *Correction (count)* reason will not take a count below zero, so it
cannot be used to *create* a deficit; it can only bring one back up.

## Cancellation and refund behaviour

Restores are symmetric with consumption. When an order against a cut-off assembly is cancelled or refunded, the
cascade **halts at that assembly** (exactly like the [keep-assembled](/features/sub-assemblies/keep-assembled/)
halt): the full quantity is restored to its pre-assembled shelf, and nothing below is restored, because nothing
below was consumed in the first place.

If the consumption had driven the shelf negative, a partial restore lifts it partway back: −5 then a +3 restore
lands at −2, not clamped to 0, keeping the deficit arithmetic honest.

<Aside type="caution" title="Do not flip the switch mid-order-lifecycle">
The return side follows the **current** setting, not a replay of what happened at order time. If you turn *Only
consume pre-assembled stock* on (or off) *between* an order and its cancellation, the restore follows the new
state, which can break the symmetry. Change it when there are no in-flight orders against the assembly. This is
the same class of caveat as the keep-assembled switch, and it applies to a per-location rule in the same way.
</Aside>

## Multi-layer trees

Because the decision is per node, you can mix cut-off and cascading assemblies in one tree:

```
Finished good B
  └── Assembly S        (off — cascades)
       ├── Raw R1
       └── Assembly T   (on — stops here)
            └── Raw R2
```

For a sales order of B:

- **S** has it off, so demand beyond S's shelf passes down to R1 and T.
- **T** has it on, so demand reaching T is taken from T's shelf only. R2 is never consumed, and T's contribution
  to "sellable" is T's shelf alone.

Each cut-off node is an independent cut; the walk continues normally everywhere else.

## How this differs from the finished-good setting

These two are easy to confuse. Different scope, different effect:

| | **Only sell pre-assembled quantities** | **Only consume pre-assembled stock** |
|---|---|---|
| Lives on | a **finished good** (Settings tab → Preferences) | an **assembly BOM** (Settings tab → Preferences) |
| Effect | caps the **finished good's own** Shopify availability at its pre-assembled shelf | stops sales demand at **this assembly BOM** inside a tree; materials below are never consumed or counted |
| Documented in | [Bill of materials → Settings](/features/bill-of-materials/settings/) | this page |

They are complementary and can be used together: a finished good can cap its own availability while an assembly BOM deeper in its tree independently refuses to cascade into its materials.

## Common gotchas

- **Sellable, not buildable, is what sells.** When a cut-off sits somewhere in a tree, the storefront-facing
  number is the sellable figure. The higher buildable number is informational: it is the physical ceiling, not
  the offer.
- **Deficits are real, not errors.** A negative pre-assembled balance on a cut-off assembly means it sold beyond
  its shelf. That is by design; top the shelf up to clear it.
- **Turning it on late does not rewrite history.** Orders processed while it was off cascaded normally. Changing
  it now affects future orders only.
- **Builds always consume materials.** Do not expect a work order or a Quick build run to respect the cut-off.
  Those are deliberate builds and always pull materials.

## Where to next

- [Pre-assembled stock](/features/sub-assemblies/pre-assembled/) — the shelf this draws from, and how to adjust
  it.
- [Keep-assembled cascade](/features/sub-assemblies/keep-assembled/) — the other Preferences switch, which halts
  the return-side walk.
- [Nesting & execution](/features/sub-assemblies/nesting-execution/) — how expansion works, and where this
  cut-off lands in it.
- [Bill of materials → Settings](/features/bill-of-materials/settings/) — the finished-good cousin of this
  setting.

<DocUpdated date="2026-11-19" />